Work · Drylining
MF ceilings and metal stud across large floors
The framing stage is the one that decides whether the finished ceiling is flat. These photographs show MF grids and metal stud partitions before boarding, from a rear extension with the garden still open behind it to a large open commercial floor set out with a scissor lift.
More than one site is shown. No location or size is attached.
This work is part of
Metal stud, MF ceilings, acoustic linings and boarding across large projects, by one directly employed team.






Send us the drawings.
Drawings, a specification and a programme, or a phone call if it is quicker. We will come back with a price for the whole plastering and lining package and a straight answer on the dates.


